NYMC > Campus Master Plan > Timeline

Campus Master Plan Timeline

2023

  • Dec - The Nicholas and Liberta Testa Fitness Center and Dr. Edward F. and Mrs. Anna M. Asprinio Fitness Center upgrades
  • Sept - The Drs. Esther and Ben Chouake Student Commons opened on the ground floor of the SHSP
  • Sept - The creation of a lactation room/Zen Den, student study spaces, and a new SLP Clinical Skills Preparation room
  • Sept - Clinical Skills and Simulation Center expansion construction begins
  • April - The SHSP created the Department of Rehabilitation Sciences in April 2023, joining together the Divisions of Physical Therapy and Speech-Language Pathology.
  • April - The renovations and new laboratory space in the Basic Sciences Building transformed the space to provide both innovative and collaborative energy by design to enrich and diversify biomedical research. Enhancements include the construction of 17,000 square feet of multidisciplinary research space, accommodating up to 12 research teams; 3,000 square feet of shared core instrumentation space; and installation of flexible casework systems and best-in-class equipment, such as biosafety cabinets, autoclaves and fume hoods.

2022

  • Aug - Clinical Trials Unit opens on Skyline's third floor, to host ad-hoc and long-term outpatient clinical research studies.
  • Aug - SHSP Room 102, once a classroom, was converted into a flexible D.P.T. classroom and lab space.
  • Aug - Removal of the wall transformed SHSP Rooms 111 and 112 into a remodeled flexible D.P.T. classroom and lab space.

2019

  • Nov - Health Sciences Library opens new Reading Room -- formerly occupied by journal stacks -- as designated quiet study space with ergonomic seating, adjustable height workstations, spacious desks and seating booths with electrical and USB outlets throughout
  • Oct - Bioinc@NYMC celebrates the grand opening of expanded space at its five-year anniversary. Almost doubling in size, the 9,500-square-feet expansion offers additional support to biotech start-ups and will increase the incubator’s economic impact in the Hudson Valley (totaling to 19,500 square feet of incubator space)
  • Oct - Family Health Center clinic opens on the third floor of 19 Skyline Drive. 
  • Oct - TCDM launches the Touro Dental Health Kids, a dental pediatrics clinic
  • May - Renovation of the campus store re-opens serving kosher options

2018

  • Sept - NYMC administrative offices relocation and renovation in Sunshine Cottage and 19 Skyline Drive complex complete
  • Jan - Touro Dental Health clinic opens in 19 Skyline Drive complex

2017

  • Nov - NYMC administrative offices relocation and renovation in Sunshine Cottage and 19 Skyline Drive complex commences
  • Jan - Dental clinic construction commenced

2016

  • Oct - Driveway connecting 19 Skyline Drive to central campus opens
  • Sept - Grand Opening of Touro College of Dental Medicine at NYMC in 19 Skyline Drive
  • Jul - Driveway Groundbreaking Ceremony
  • May - NYMC Anatomage and Radiology Suite Dedication Ceremony
  • Feb - Dr. Edward F. & Mrs. Anna M. Asprinio Fitness Center Ribbon Cutting

2015

  • Nov - Student Wellness and Fitness Center under construction
  • July - Dana Road Walkway Ribbon Cutting
  • May - NYMC School of Health Sciences and Practice funded the Speech-Language Pathology Clinic in Vosburgh Pavilion, consisting of four treatment rooms, a clinical educator office, space for clinic materials, and a student clinician workspace. 
  • May - Dana Road Walkway construction commenced

2014

  • Nov - Launch of BioInc@NYMC
  • July - Dental school construction commenced in 19 Skyline Drive complex

2013

  • Dec - Clinical departments move from Munger Pavilion to 19 Skyline Drive complex complete
  • July - Clinical Skills and Simulation Center relocates in unveiled dedicated space in 7 Dana Road
  • Feb - Center for Disaster Medicine opens in 7 Dana Road
  • Apr - College purchases 19 Skyline Drive

2012

  • Dec - 7 Dana Road renovations commenced

2011

  • May - NYMC joins the Touro College and University System